Run report – Run 6 – 6 Oct 17
Aim
Complete the braking bedding in process for the front right brake, using higher speeds to increase energy input.
Operation
Weather 15C, 1015 mb. Lovely day, broken clouds.
Delta taxiway, approx. 4000 ft available, with overruns if required.
- 1120 hrs. Wind 1 o/c, 5 kt. D2 to D4
- Fuel 50 to 38%, engine run time 5:00
- Profile 3, 75 mph/75NL
- 2 accels up to 80 and 70 mph, both using 55-60 bar to stop, then power against brakes to complete the run. Front right brake remains below 200C, others at 350+
- First use of power steering, for test only as it’s not required for runway running. A couple of tiny twitches when radio transmissions are made alongside the Car, otherwise no sign of interference. Steering response good throughout
Summary
Concern that the front brake glazing may require strip down and re-work.
Procedural points
- Nil
Technical points
- Strain gauges by driver’s feet need taping to prevent abrasion
Run report – Run 7 – 6 Oct 17
Aim
Complete the braking bedding in process for the front right brake.
Operation
Weather 14C, 1015 mb. Lovely day, broken clouds.
Delta taxiway, approx. 4000 ft available, with overruns if required.
- 1230 hrs. Wind 6 o/c, 7 kt. D4 to D2
- Fuel 61 to 48%, engine run time 5:00
- Profile 3, up to 80 mph using 80NL
- First accel, power off at 80, Car accelerates to 90 mph as engine winds down. Brakes up to 50+ bar, brake to stop. Front right brake still cold
- Second accel, power off at 80, Car accelerated to 95 mph as engine winds down. Brakes up to 50+ bar. Front right brake finally responds and starts to catch up with the others. Brakes at ~400C, front right over 350C
Summary
Front right brake appears to be coming to life, but requires more evidence to confirm it has bedded in.
Procedural points
- EJ200 takes a couple of seconds to stop producing thrust. Monitor on future runs
Technical points
- G meter and distance counter are being modified, will be monitored during future runs